Installing, conditioning and maintaining columns , Column conditioning
المؤلف:
Sue Jickells , Adam Negrusz (Editors)
المصدر:
Clarkes Analytical Forensic Toxicology
الجزء والصفحة:
p479-480
2026-11-21
46
Installing, conditioning and maintaining columns
Column conditioning
A new column requires conditioning before use to remove volatile impurities that remain after deactivation of the support, and/or the coating and packing processes. The column should be installed in the injector port only, with the detector end disconnected. With the column at room temperature, a low carrier gas pressure (14–35 kPa) should be maintained for half an hour to purge oxygen from the system. The temperature may then be raised by about 1C/min, to 10C above the anticipated working temperature or the maximum operating temper ature, whichever is less, and the temperature is maintained (2 h for a manufactured capillary, 12 h for a packed column or self-packed capillary). Care must be taken not to exceed the maximum operating temperature. After conditioning, the column is connected to the detector, and a period of further conditioning is carried out if the background signal is excessive. Some phases (e.g. OV-17) are particularly oxygen-sensitive and can be ruined by careless conditioning. A constrictor fitted to the detector end of the column helps prevent back diffusion of oxygen if air or oxygen is supplied to the detector.
0
0
الاكثر قراءة في تحليل السموم
اخر الاخبار
اخبار العتبة العباسية المقدسة